Modular Thermal Treatment

Project Background

Project Background

To support Malaysia’s urgent need for safe and effective medical waste management during the COVID-19 pandemic, Nurov Environmental successfully designed and constructed a mobile medical incinerator with a capacity of 500 kg/hour.

This project was executed for a licensed medical waste management company in Teluk Panglima Garang, Malaysia and was tailored to ensure compliance with stringent environmental and health regulations. The incinerator was engineered to handle a wide range of infectious and hazardous medical waste streams, including contaminated PPE, sharps, and other biohazardous materials.

Key Features

Key Features

  • High-capacity mobile system capable of treating up to 500 kg of medical waste per hour.

  • Dual-chamber combustion design ensuring complete waste destruction and minimized emissions.

  • Integrated air pollution control system to comply with Department of Environment (DOE) standards.

  • Mobility and flexibility, enabling rapid deployment to areas with urgent waste treatment needs.

  • Robust construction and automation, allowing reliable operation while minimizing operator exposure.

  • By delivering this project, Nurov Environmental played a vital role in enhancing public health safety and providing a sustainable, on-demand waste treatment solution during a time of national urgency.